We Poured the Floor!
North Campus Student Building — Construction Update · Week of October 12–18, 2026
There are weeks on a build where the work is quiet and underground, and then here are weeks where something happens you can actually stand on. This was one of the second kind.
**This week, our crews poured the slab on grade** — the concrete floor of the new North Campus student building. After weeks of grading, laying vapor barrier, and tying out what feels like miles of rebar, the team finished prepping the pad, poured it, and stripped the forms. For the first time, the footprint of this building isn't a plan on paper or a grid of steel in the dirt. It's a solid, finished floor sitting right where our students will one day walk in the doors.

If you've driven past the North Campus lately, this is what you would have seen taking shape: the full grid of reinforcing steel laid out across the pad, every line placed and inspected before a single truck arrived. Prep like this is the unglamorous part nobody frames on a wall — but it's the reason the floor underneath everything will stay true for decades.

Then came pour day.

Crews were on-site before sunrise, the concrete pump boom reaching out over the pad while the slab went down section by section. From there it's a race against the concrete itself — finishing the surface smooth and level while it's still workable.

Once it cured, the team came back through to sawcut the control joints — the clean lines you can see across the surface that let the concrete expand, contract, and settle without cracking. Small detail, big difference in how this floor holds up over the years.

And here's the whole thing, finished — the floor of the future student building, framed against our existing North Campus.

What's next
With the slab complete, the project moves into its next phase. In the coming week, Christensen Construction begins coordinating the on-site wet utilities and starts foundation work for the trash enclosure. From here, you'll start to see the building rise — the floor is set, and the walls aren't far behind.
A word to those who've given
Every milestone like this one is possible because of you. Slab on grade is more than a construction step — it's a marker of momentum, and a good-news report for everyone who has invested in what God is building here. The project remains on track: no outstanding design questions and no open approvals this week, which means the crews can keep moving without delay. Your generosity is quite literally the ground our next generation will stand on. Thank you.
We'll be back with another update in the next couple of weeks as the walls begin to take shape. Until then — come drive by, say a prayer over the site, and dream with us about the students who'll fill this place.